Construction / Contractor
For a civil contractor, builder or interior fit-out firm. Every job is a project billed to a client against an estimate (BOQ). Work is measured on site and signed for in a measurement book, material is indented, approved and issued to the site's own store, labour is paid off a muster roll, subcontractors get work orders with their own scope and claims, and the client is billed progressively (RA bills) with retention held back.
Set up before your first site
Do these once, in this order. The owner (or an Office login) does all of them.
- Pick the parts of the job you run Tools > Settings > Projects, Site Work card. A new contractor starts with work orders, indents, RA billing, BOQ variance and the measurement book on, and site wages off; an interiors firm also starts with the measurement book and BOQ variance off. Switch on only what you do today; each switch adds its own screens, reports and permissions.
- Add your material list under Materials > Items: cement, steel, sand, with the unit you buy and issue them in.
- Add the people you deal with in the Directory: clients (New Client), Contractors you sublet work to, Labourers on the muster, and Suppliers. Your own engineers and supervisors go under Staff.
- Open the first project with New Project: site name, client, site address, estimate amount, retention %, dates, and the Site Engineer responsible. Naming the engineer is what puts the site on that engineer's phone.
- Enter the BOQ on the project's Work Items tab: each line with its unit, quantity, rate and cost rate. The total can be written back as the estimate.
- Create a login for each person by the job they do, and say which sites they may see (see Who signs in).
- Run one test day: a diary entry, an indent, one measurement recorded and certified, one RA bill and a receipt. Cancel the test RA bill afterwards; cancelling releases its work to be billed again.
How the work flows
A job moves between the site, the store and the office. Each step says who does it and what prints. A step appears only when its switch is on in the Site Work settings.
Open the project
New Project against the client, then the BOQ lines on Work Items. Every rupee the site spends from now on carries this project, so its page adds up live.
Run the site day
Start on Today. Mark Attendance (one tap copies yesterday's gang with Same as yesterday), then the day's jobs from the tiles. In the evening open the DPR: labour by trade, goods received, material issued, measurements, equipment hours, snags and site spend are already filled in. Type the work done, add photos and press Send DPR. On Labour & Wages settle the muster into wage payments.
Get material to site
- Indent: the site asks for material with a needed-by date.
- Approve: somebody else authorises it line by line ("you asked for twenty bags, take twelve").
- Buy and receive: a purchase order to the supplier. When the lorry arrives, Receive Goods lists the site's open orders and challans; pick one and record what came, what was rejected and why. A store keeper can receive against a purchase order directly: the whole order becomes its delivery challan at the order's rates.
- Rejected or short: the supplier is not owed for it. Debit notes due on the Indents screen lists those bills and drafts the purchase return for just the quantity owed back.
- Issue: Issue to Work hands material from the site store to a BOQ item, a location, a subcontractor or a labourer.
- Client's own material (free issue) enters the store at nil, so it never raises your average cost.
Measure and certify
The engineer records what was built in the Measurement Book: units, length, breadth, depth and where on site. A different person signs it off. Only certified work moves a BOQ line, and only certified work can be billed.
Sublet work
On Work Orders, give a subcontractor their order with its own scope (which BOQ lines, at what rate) and retention %. Their bills are certified, approved and then posted as ordinary purchase vouchers, so TDS and the payment split come with them.
- TDS 194C is withheld once a subcontractor passes the ₹1 lakh year limit, including on that year's earlier bills; with no PAN it is 20%. An advance to a subcontractor withholds its TDS too, and the next bill takes off only the rest.
- Labour supplied by a contractor is billed week by week from the muster, overtime included. A billed week is locked, so its days cannot be marked or changed again, and two orders cannot bill the same days.
Bill the client
On RA Bills (Stage Bills if you bill by stage), raise the running-account bill: certified quantity less what was already billed, at the BOQ rate, with retention and any mobilisation advance held back. A project with no retention % of its own uses the business's default. The bill is a sales invoice, so GST works as usual.
Take the money, book site costs
Receive Payment (Accounts menu) records a full or part payment against the project. Site Expense books a cost to the site itself and is paid from the site's cash when it keeps some; office rent and salaries go through Expense instead. Site cash can never go below zero, labour advances paid from it included.
Watch the cost and close the job
The BOQ Cost Variance report compares budget with what was consumed and raises escalation alerts while there is time to act. Committed cost counts orders not yet delivered and goods received but not yet invoiced; returns to suppliers come off material cost. When the work is accepted, release the retention and close the project.
The whole journey on one page:
flowchart TD
A[New Project
client · site address · estimate · dates · retention %] --> PR[(Project created with its site store)]
PR --> B[Work Items tab: BOQ lines
qty · rate · cost rate · phase dates]
B --> WI[(The BOQ lines)]
PR --> C[Site Diary: what happened
manpower · idle hours · weather]
C --> PL[(Diary entry)]
subgraph Measurement
MB1[Measure a BOQ line
units · L · B · D · location] --> MB2[(Entry: awaiting signature)]
MB2 --> MB3[Certify] --> MB4[(Completed qty RECOMPUTED)]
end
subgraph Material
M1[Indent: lines · qty · needed by] --> MR[(Requested)]
MR --> MA[Approve line by line] --> M2[Purchase Invoice for the site]
M2 --> M3[Issue to Site
from store to site warehouse]
M3 --> SP[(Stock issued to the project)]
end
subgraph Labour
L1[Muster roll: mark days] --> L2[Settle: wage slip] --> PW[(Wages settled · cash paid)]
end
subgraph Subcontract
S1[Work Order to contractor] --> SC[(The work order)]
SC --> SS[Scope: their lines · their rate]
SS --> S2[Claim: gross · retention · advance recovered]
S2 --> S3[Retention release on acceptance]
end
WI --> Measurement
PR --> Material & Labour & Subcontract
MB4 --> RA[Raise RA bill
certified minus already billed, at the BOQ rate]
RA --> SI[Sales Invoice · retention held as a fact]
SI --> RP[Receive Payment · receipt printed]
SP & PW & S2 --> BV[BOQ Cost Variance
budget vs consumed · escalation alerts]
SE[Site Expense] --> SP2[(Expense booked to the project)]
Who signs in
Give every person their own login; never share the owner's. Adding a user on a contracting business asks what the person does first. That choice decides the screen they open on, their phone's bottom bar and the switches they start with. Any switch can be changed afterwards.
Each role is a card: pick it and the card says in plain words what this person can and cannot do, their approval limits, the screen they open on and their menu. The full permission list sits folded under Change permissions for when a person needs something extra.
Approvals
Indents, purchase orders, subcontractor bills and site cash expenses above someone's limit wait on Approvals, grouped by kind with a count and your own limit beside each. Every request shows who asked, from which site, the amount and a plain line about your limit. A request above your limit, or your own, shows greyed as Needs a higher approver or Your own request: you can see it but not decide it. Rejecting asks for a reason.
- Open the user form Tools > Settings > Users > Add User, or from the person's own row under Staff.
- Pick the seat in Does (Site Supervisor, Site Engineer...) and link their staff record in Contact.
- Set the login: user name and password (or their email address on a cloud business).
- Say which sites under May see: leave it on every project, or switch on Only certain projects and pick them.
- Review the switches under May do, add or remove any, and save. The person gets the change at their next sign-in.
Site Supervisor
Runs the site: the muster, the diary, the programme.
- Opens on
- Today
- Phone bar
- Today · DPR · Muster · Projects · New
- Starts with
- Create & Edit Projects, Site Wages, Material Indents, View Reports, Add Contact
- Not given
- Any money figure; billing and work orders; the counter's product, stock and purchase switches
Site Engineer
Holds the tape and writes the measurement book.
- Opens on
- Today
- Phone bar
- Today · Measure · DPR · Muster · New
- Starts with
- Create & Edit Projects, Record Measurements, Material Indents, View Reports, Add Contact
- Not given
- Certify Measurements (a small builder can tick it by hand); any money figure
Store Keeper
The store: raises indents and issues material to site.
- Opens on
- Today
- Phone bar
- Today · Indents · GRN · Stock · New
- Starts with
- Material Indents, Add Contact
- Not given
- Approving their own indents; the site diary; any money figure
Billing / Accounts
Bills the client and the contractors. The one seat below Office that reads money.
- Opens on
- Today
- Phone bar
- Today · Bills · Measure · Clients · New
- Starts with
- Bill Projects, Work Orders, See Project Money, Certify Measurements, Release Retention, Payment Entry, View Reports, Add Contact
- Not given
- Site wages, indents and the site diary
Office
Owner or office manager: the whole book, new jobs and every report.
- Opens on
- Dashboard
- Phone bar
- Dashboard · Today · Projects · Clients · New
- Starts with
- Everything, including all 19 project reports
- Note
- Only someone who already has full access can create this seat
A seat whose screen is switched off for this business opens on the Dashboard instead, and a login saved with no seat opens like Office. Reset to seat defaults puts an existing person back on the standard set; it warns first, because it discards anything set by hand. Re-picking a seat on an existing login changes where it opens, never its switches. The full switch list is in What each person may do, and the rules shared by every trade are in Users, Roles & Permissions.
Which sites a person can see
Separate from what they may do. A seat can be left on every project, which is what the office and the billing desk usually want, or pinned to only certain projects for somebody handling three contracts.
A Site Engineer also sees any job that names them as its engineer, without anyone having to list it - which is the point of the seat, since an engineer's sites change every month. So "Only certain projects" with nothing picked is a real setting for an engineer: the button reads Their own sites only and means exactly the sites pinned to me. To give somebody no projects at all, take away their project switches rather than emptying the list.
Where it is in the app
A contractor opens on its own home screen, laid out by the job the person signed in does. Each menu shows only what this seat is granted and this business has switched on; a menu left empty does not appear.
Today: the site's day on one page
Every site login opens on Today. The chip at the top is the site you are working on — the one you used last; tap it to pick another. Below it:
- Do now — big tiles for the day's jobs this login may do: Attendance, DPR, Measure, Receive Goods, Issue to Work, Raise Indent, Snag / NCR, Site Expense, Receive Payment, Equipment Log. A tile says when the job is done (✓ 42 marked).
- Waiting on you — indents to approve or issue, measurements to certify, goods due in, bills to collect, approvals.
- Today on this site — what was already entered: labour by trade, goods received, material issued, measurements, equipment hours, snags and NCRs, site cash spent.
Until the day's DPR is sent, a bar on top says so and opens it. The DPR page fills in the day's facts on its own; type the work done, add photos and press Send DPR. The office and the project manager open on the Dashboard and find Today just after it.
A form opened from Today or the New menu goes straight to the site you are on and shows it at the top with a Change link.
On a computer: the menu bar
Across the top: Today and the Dashboard, then one menu per area, then New with the day's jobs, Change Site and New Project.
| Menu | Holds |
|---|---|
| Projects | All Projects · Schedule · Work Orders · Approvals |
| Site | DPR · Labour & Wages · Quality & Safety · Hindrances · Drawings & RFIs · Letters · Equipment (On site, Register, Service due) |
| Materials | Indents · Receive Goods · Issue to Work · Stock & Audit · Purchase Order · Delivery Challan · Purchase Invoice · Items |
| Billing | Measurement Book · RA Bills (Stage Bills when you bill by stage) · Contract & Costs · Sales Invoice · Counter Sale |
| Reports | The project reports this seat may read (BOQ Cost Variance is one), then Business Reports and Day Operations |
| Directory | Clients · New Client · Suppliers · Staff · Subcontractors · Labourers |
| Accounts | Receive Payment · Site Expense · Site Cash · Accounting · Expense Register · Reminders · Loans |
On a phone or tablet: the side menu and the bottom bar
The side menu lists the same menus in the same order. The bottom bar carries the screens each seat works all day and ends with New, which opens the day's jobs.
| Seat | Opens on | Bottom bar |
|---|---|---|
| Site Supervisor | Today | Today · DPR · Muster · Projects · New |
| Site Engineer | Today | Today · Measure · DPR · Muster · New |
| Store Keeper | Today | Today · Indents · GRN · Stock · New |
| QC & Safety | Today | Today · QHSE · Docs · DPR · New |
| Billing & QS | Today | Today · Bills · Measure · Clients · New |
| Accounts | Today | Today · Bills · Site Cash · Clients · New |
| Project Manager | Dashboard | Dashboard · Today · Indents · Measure · New |
| Office | Dashboard | Dashboard · Today · Projects · Clients · New |
Two entries carry a red count, refreshed every two minutes: Indents shows indents raised and not yet authorised, and Measurement Book shows measurements recorded and not yet signed.
Screens
Projects
The list of jobs by status (quoted, running, on hold, completed) with progress and money strip. Opening one shows the project home: headline money (estimate, billed, received, retention held, cost so far), receipt history, and tabs for Work Items, Progress, Materials, Wages, Subcontracts. Hold and resume a project with a reason.
Work Items (BOQ)
The itemised estimate: description, unit, quantity, rate, cost rate, completed and billed quantity, planned start and finish per line so the tab can say which phase is late. The total can be written back as the estimate; the table prints as the estimate document.
DPR (Daily Progress Report)
One page per site and day. The facts come in from where they were entered; you add the work done (typed straight on the page, or More detail for weather, crews, BOQ quantity and visitors), instructions, notes and photos, then Send DPR. Sending locks the day; Reopen unlocks it. The DPR entries are dated entries of what happened, manpower count, idle hours, weather and photographs. Exports whole, not just the pages scrolled. With the measurement book on it records the day; with it off, its "done today" figure is also what moves a BOQ line.
Measurement Book
What was actually built, measured on site and signed for by somebody other than whoever held the tape. Only certified work moves a BOQ line, and only certified work can be billed. See Measurement Book.
RA Bills
The client's running account: every bill with its gross, the retention withheld, the advance recovered and what was payable. Cancelling one releases its work to be billed again. See Progress (RA) Billing.
Work Orders (Subcontracts)
Contract amount, retention %, dates and status per contractor, plus the contractor's own scope - which BOQ lines at which rate - and the claims raised against it. Print the order for signature on site; claims post as ordinary purchase vouchers, so TDS, reverse charge and the payment split come with them. See Work Orders & Subcontracts.
Indents (Material)
Multi-line requests from the site, authorised line by line by somebody other than the store keeper, purchased against, then issued to the site store. The destination is never asked: it is always the project's own warehouse. See Material Indents.
Labour & Wages
Daily muster roll per labourer or crew count, settled into wage slips. Same as yesterday ticks the people present on the last marked day. See Site Labour & Wages.
Equipment
One screen with three tabs: On site (each machine's log sheet: hours, idle time, diesel), Register (every machine the business owns or hires, with its rate and fuel norm) and Service due (what needs servicing by hours or by date).
Hindrances and extension of time (EOT)
Record what held the work up on Hindrances (Site menu). To ask the client for more time, New Request on the EOT register lists the hindrances not yet claimed: tick them and the days and reasons fill in. The days asked cannot exceed the ticked hindrances' total. A request with no hindrance is allowed only with a reason such as Variation / extra work and is marked No hindrance linked. Granting an EOT moves the project's planned end date.
BOQ Cost Variance (a report)
Budget vs consumed per cost head with escalation alerts, under Reports. See BOQ Cost Variance.
Money
- Receive Payment - a (partial) client payment against a project, with running balance and a printed receipt.
- Site Cash - each site's float, top-ups from head office, expenses waiting for approval and the cash count. The accounts desk sees what is waiting on Today.
- Site Expense - books to the site's cost. General overhead (office rent, staff) goes through Expense Entry instead.
- RA billing - see Progress (RA) Billing. The bill IS a sales invoice, so your invoice design prints it.
- Purchase & Sales - a contractor does buy and sell: material purchase, surplus sale, plant hire, ordinary invoices against estimates.
The project’s money
flowchart TD
A[Estimate agreed with the client] --> B[Advance received]
B --> C[Work progresses on site]
C --> D[RA bill raised on measured work]
D --> E[Client pays · retention withheld]
C --> F[Costs: material · labour · subcontract · site expense]
E --> G[Received so far]
F --> H[Spent so far]
G & H --> I[Where the project stands today]
I --> J{Cost running ahead of progress?}
J -->|yes| K[BOQ variance alert · re-quote or control]
J -->|no| C
C --> L[Work accepted] --> M[Retention released · project closed]
Settings
Settings open on one list down the left, by area, with a search box: Business & Size first, then each area of the job, then App (Users & Logins, Printers, Backup & Sync). Business & Size shows the size you run at with Compare the three sizes: Small builder, Contractor and Company side by side, with the menus, logins and reports each adds. A new size is confirmed, then applies when you press Save. The + extras chips jump to the switch for anything you run beyond your size.
Print & Numbering keeps everything a printout carries on one page: the letterhead, your registration lines (GSTIN, PAN, licence), the number series of each document, the paper each document prints on (an RA bill on A4, a receipt on a roll), and a live preview of the RA or stage bill, work order and indent as they will print.
Seven switches decide which halves of the job this business runs. They are first asked when the business is created. Each one removes a section, a tab and the reports behind it when off, so you are never shown a screen for something you do not do.
| Setting (Tools > Settings > Projects, Site Work card) | Effect |
|---|---|
| Work Orders & Subcontracts | Work Orders, contractor scope, claims and retention. |
| Material Indents | Indents, line-by-line approval and issue-to-site. |
| Site Labour & Wages | Muster roll and wage slips. |
| Progress (RA) Billing | Running-account bills on the client, retention and mobilisation advance. |
| Project Phases | Stages with their own dates, status and completion. |
| BOQ Cost Variance | The variance section and its escalation alerts. |
| Measurement Book | Quantity reaches a BOQ line only through a certified measurement. Off, the site diary moves it and a bill can charge for work nobody signed for. |
What each person may do
Eleven switches, on the Projects group of a user's permissions. Ten are write switches and are off for a view-only login; See Project Money is the one read switch, so it survives view mode - a read-only owner reviewing a closed year is exactly who a figure should still be shown to.
| Switch | Lets the person |
|---|---|
| Create & Edit Projects | Open a job, change its estimate and work items, hold or close it. Also opens the Site Diary. Off still leaves the project book readable. |
| Bill Projects | Raise the client's RA bill and take a contractor's claim. Also opens the RA Bills register. |
| Work Orders | Register a work order to a contractor and write its scope. |
| Site Wages | Mark the daily muster and pay out wages. |
| Material Indents | Raise an indent and issue stock to the site store. |
| Approve Indents | Authorise an indent line by line - "you asked for twenty bags, take twelve". |
| Record Measurements | Write into the measurement book: units, dimensions, where on site. |
| Certify Measurements | Sign a measurement, which is what lets it move a BOQ line and be billed. |
| Release Retention | Let retention go - the client's, or a contractor's. |
| Manage Project Masters | Edit the cost heads, hold reasons and units. |
| See Project Money | Read only. Estimate, billed, received, retention held and cost against budget - the money reports, the dashboard's money band and every chart. |
Four of these come in pairs that are deliberately not one switch, because on any job of size they are two different people: raising an indent and approving one, recording a measurement and certifying it, billing and releasing retention, and writing a job and seeing what it is worth. Giving both halves to one person is a decision a small business is free to make - it is just not made for you.
Every section in the menu is hidden unless the setting above is on and the person has the switch for it, so a screen you cannot use is simply not there rather than refusing when you open it. Somebody with none of the site jobs sees no Site menu at all.
Reports
Nineteen project reports, one menu entry each. Which of them a person is offered depends on three things together: whether the setting behind it is on, whether they hold the switch for that part of the job, and - for the eleven that quote money - whether they have See Project Money.
| Seat | Sees |
|---|---|
| Site Supervisor | 7 of 19 - the diary, downtime, phases, slippage and the registers they work from. No money at all. |
| Site Engineer | 7 of 19 - including the Measurement Register, which is quantities and signatures rather than money. |
| Store Keeper | 6 of 19 - the material registers and the site record. |
| Billing / Accounts | 15 of 19 - everything except the labour and material registers, which are not their job. |
| Office | All 19. |
The money ones are Money Summary, Job Profitability, Billing & Retention, BOQ Cost Variance, Subcontract Status, Work In Progress, Retention Ageing, Contractor Running Account, P&L By Cost Head, Labour Cost By BOQ Line and Cash Flow vs Progress. The rest are the site's own record: Phase Progress, Schedule Slippage, Site Diary, Downtime Analysis, Labour Register, Material vs Estimate, Measurement Register and Material vs BOQ Line.
Also the ordinary business set - Day Book, Expenses, Income, Profit & Loss and the sales/purchase registers, since a contractor does buy and sell - and Loan Reports for advances and subcontractor loans. Per project you can print the RA bill, the measurement book abstract, a subcontractor's bill, the subcontract work order, the material issue slip, payment receipts, site expense vouchers, wage payment slips and the executive project summary.